SiteLog

Riverside Office Tower, Phase 2

MS Project export · Data date 24 Sep 2026

Schedule source

Where should the data come from?

Sign in to see your company's schedulesYou're viewing the sample. Your administrator sends you an email and temporary password.

Upload stopped

Export

Export the dashboard

~9 pages · 9 tasks

Sign in

Forecast finish is 7 days behind baseline

12 Feb 2027 forecast against a baseline of 5 Feb 2027. 10 critical tasks remain; any further delay on them moves the finish date.

35%
complete, against 39% planned
0.89
schedule performance (SPI)
0.93
cost performance (CPI)
RM 3.93M
spent of RM 10.46M budget
1
overdue tasks
10
open critical tasks

Project info

Project

Riverside Office Tower, Phase 2

Client
Suria Pelangi Development Sdn Bhd
Project stage
Construction – Superstructure & MEP
Contractor
Kenangan Bina Sdn Bhd
Consultant
Jurutera Perunding Aliff Sdn Bhd
Project value
RM 45.80M
Location
Jalan Sultan Ismail, Kuala Lumpur
Contract period
2 Mar 2026 – 12 Feb 2027
Data date
24 Sep 2026
Project Manager
Ahmad Faisal bin Hashim
Contract No.
NPM/2026/014
Defects Liability Period
24 months
Retention Sum
RM 2,290,000

Physical progress

Cumulative planned work by week, weighted by weightage/work/duration. The gap between the baseline and the dot shows how far behind or ahead the project is today.

Financial progress

Cumulative planned spend by week, weighted by cost. The gap between the baseline and the dot shows how far behind or ahead the spend is today.

Timeline

Completed work, critical path, and the lookahead window, against baseline.

Visible time range

Date range

Legend
ProgressRemainingCritical pathBaselineOverdue
ProgressRemainingCritical pathBaselineOverdue

Showing 21 Feb 2026 – 7 Mar 2027

Wt · Earn · Cmp20262027FebMarAprMayJunJulAugSepOctNovDecJanFebMarStatus 24 Sep▾ Pre-constructionPre-constructionDesign approvalDesign approval1.1 · 1.1 · 100%Permits and authority appr…Permits and authority approvals0.4 · 0.4 · 100%Contractor mobilisationContractor mobilisation0.6 · 0.6 · 100%● Site possessionSite possession0.0 · 0.0 · 100%▾ SubstructureSubstructure● Excavation and earthworksExcavation and earthworks3.6 · 3.6 · 100%● Bored pilingBored piling11.5 · 11.5 · 100%● Pile caps and ground bea…Pile caps and ground beams5.2 · 5.2 · 100%● Substructure completeSubstructure complete0.0 · 0.0 · 100%▾ SuperstructureSuperstructureTower crane recertificationTower crane recertification0.2 · 0.1 · 60%● Level 1 to 3 columns and…Level 1 to 3 columns and slabs10.5 · 8.9 · 85%● Level 4 to 6 columns and…Level 4 to 6 columns and slabs10.5 · 0.0 · 0%● Roof slabRoof slab4.0 · 0.0 · 0%● Structure topped outStructure topped out0.0 · 0.0 · 0%▾ MEP servicesMEP servicesElectrical first fixElectrical first fix6.2 · 1.9 · 30%Plumbing and drainagePlumbing and drainage4.6 · 0.9 · 20%MEP first fix completeMEP first fix complete0.0 · 0.0 · 0%HVAC ductworkHVAC ductwork6.9 · 0.0 · 0%Fire protectionFire protection3.7 · 0.0 · 0%▾ Envelope and finishesEnvelope and finishesBrickwork and blockworkBrickwork and blockwork5.3 · 0.5 · 10%● Curtain wall and glazingCurtain wall and glazing13.4 · 0.0 · 0%● Building watertightBuilding watertight0.0 · 0.0 · 0%Plastering and screedingPlastering and screeding3.6 · 0.0 · 0%● Ceiling, tiling and pain…Ceiling, tiling and painting5.9 · 0.0 · 0%▾ Testing and handoverTesting and handover● Testing and commissioningTesting and commissioning1.7 · 0.0 · 0%● Snagging and defectsSnagging and defects0.9 · 0.0 · 0%● Practical completionPractical completion0.0 · 0.0 · 0%Design approval 2 Mar 2026 to 27 Mar 2026 100% completePermits and authority approvals 16 Mar 2026 to 24 Apr 2026 100% completeContractor mobilisation 27 Apr 2026 to 8 May 2026 100% completeSite possession: 11 May 2026Excavation and earthworks 11 May 2026 to 5 Jun 2026 100% completeBored piling 8 Jun 2026 to 17 Jul 2026 100% completePile caps and ground beams 20 Jul 2026 to 14 Aug 2026 100% completeSubstructure complete: 14 Aug 2026Tower crane recertification 7 Sep 2026 to 18 Sep 2026 60% completeLevel 1 to 3 columns and slabs 17 Aug 2026 to 25 Sep 2026 85% completeLevel 4 to 6 columns and slabs 28 Sep 2026 to 6 Nov 2026 0% completeRoof slab 9 Nov 2026 to 27 Nov 2026 0% completeStructure topped out: 27 Nov 2026Electrical first fix 7 Sep 2026 to 30 Oct 2026 30% completePlumbing and drainage 14 Sep 2026 to 6 Nov 2026 20% completeMEP first fix complete: 6 Nov 2026HVAC ductwork 19 Oct 2026 to 11 Dec 2026 0% completeFire protection 2 Nov 2026 to 18 Dec 2026 0% completeBrickwork and blockwork 21 Sep 2026 to 13 Nov 2026 10% completeCurtain wall and glazing 30 Nov 2026 to 8 Jan 2027 0% completeBuilding watertight: 8 Jan 2027Plastering and screeding 16 Nov 2026 to 24 Dec 2026 0% completeCeiling, tiling and painting 28 Dec 2026 to 29 Jan 2027 0% completeTesting and commissioning 18 Jan 2027 to 5 Feb 2027 0% completeSnagging and defects 1 Feb 2027 to 12 Feb 2027 0% completePractical completion: 12 Feb 2027

Ctrl/⌘ + scroll to zoom · drag to pan · drag the divider to resize namesPinch to zoom · drag to pan · drag the divider to resize names

Progress by phase

Weight, planned %, actual % and variance for each top-level phase.

PhaseWeightPlannedActualVariance
Pre-construction2.2%100.0%100.0%0.0pp
Substructure20.3%100.0%100.0%0.0pp
Superstructure25.3%45.6%35.9%-9.7pp
MEP services21.4%19.6%13.0%-6.7pp
Envelope and finishes28.3%3.5%1.9%-1.6pp
Testing and handover2.6%0.0%0.0%0.0pp
Overall39.2%34.8%-4.3pp

Key milestones

Baseline vs forecast date for each milestone, with a status chip.

MilestoneBaselineForecastVarianceStatus
Site possession4 May 202611 May 2026+7dDone
Substructure complete7 Aug 202614 Aug 2026+7dDone
MEP first fix complete30 Oct 20266 Nov 2026+7dAt risk
Structure topped out20 Nov 202627 Nov 2026+7dAt risk
Building watertight31 Dec 20268 Jan 2027+8dLate
Practical completion5 Feb 202712 Feb 2027+7dAt risk

Manhours

Planned vs actual hours by month, with the cumulative total on the right axis.

Cost performance

Contract value against budget, value of work done, money spent, and the resulting forecast at completion.

RM 45.80M
contract value
RM 10.46M
budget at completion
RM 4.10M
planned value (PV)
RM 3.64M
earned value (EV)
RM 3.93M
actual cost (AC)
0.93
cost performance (CPI)
0.89
schedule performance (SPI)
RM -284k
cost variance (EV − AC)
RM 11.28M
estimate at completion
RM -816k
variance at completion

Key highlights

What happened this period, by phase.

Pre-construction3 items
  • Design approval obtained from local authority ahead of schedule
  • All statutory permits secured before mobilisation
  • Contractor mobilised to site with full site establishment complete
Substructure4 items
  • Excavation and earthworks completed to design levels with no ground condition surprises
  • Bored piling completed across all 86 piles, pile integrity tests passed
  • Pile caps and ground beams cast and cured, substructure handed over to structural team
  • Substructure completed within 7% of baseline cost
Superstructure3 items
  • Tower crane recertified and returned to service
  • Levels 1 to 3 columns and slabs 85% complete against baseline
  • Formwork cycle time improved from 12 to 9 days per floor
MEP services4 items
  • Electrical first fix progressing on Levels 1 to 3
  • Plumbing and drainage rough-in started on Level 1
  • MEP coordination model issued for Levels 4 to 6
  • Long-lead chiller units confirmed for December delivery
Envelope and finishes3 items
  • Brickwork and blockwork started on Level 1 perimeter walls
  • Curtain wall shop drawings approved by consultant
  • Facade mock-up panel approved after second submission
Testing and handover3 items
  • Testing and commissioning method statement submitted for approval
  • Snagging checklist template agreed with client's representative
  • Handover documentation checklist circulated to subcontractors

Lookahead

Activities starting, finishing, or ongoing over the next 30 days.

24 Sep 2026 – 24 Oct 2026

PhaseActivityStartFinishStatus
SuperstructureLevel 1 to 3 columns and slabs17 Aug 202625 Sep 2026Finishing
MEP servicesElectrical first fix7 Sep 202630 Oct 2026Ongoing
MEP servicesPlumbing and drainage14 Sep 20266 Nov 2026Ongoing
Envelope and finishesBrickwork and blockwork21 Sep 202613 Nov 2026Ongoing
SuperstructureLevel 4 to 6 columns and slabs28 Sep 20266 Nov 2026Starting
MEP servicesHVAC ductwork19 Oct 202611 Dec 2026Starting

Areas of concern

Open and closed risks with their mitigation, owner and due date.

AreaConcernMitigationOwnerDueSeverityStatus
SuperstructureLevel 4 to 6 columns and slabs start delayed pending rebar deliveryExpedite rebar delivery with alternate supplier; resequence formwork crew to roof slab prepSite Agent5 Oct 2026HighOpen
MEP servicesChiller lead time risk affecting HVAC ductwork startConfirm PO with backup supplier; monitor weekly with procurementMEP Coordinator15 Oct 2026HighOpen
Envelope and finishesCurtain wall facade mock-up required two submission cyclesLock shop drawing revision before fabrication releaseFacade Sub30 Sep 2026MediumClosed
SubstructureBored piling cost overrun of RM 110,000 against baselineValue-engineer pile cap rebar detailing on remaining phasesQS1 Aug 2026MediumClosed
Site logisticsCongested single-lane site access affecting material deliveryIntroduce delivery time-slot booking system with securitySite Agent10 Oct 2026MediumOpen
MEP servicesElectrical first fix productivity below plan on Level 2Add second electrical crew for two weeks to recoverMEP Sub20 Oct 2026LowOpen
Testing and handoverCommissioning specialist availability clashes with another projectConfirm commissioning specialist booking six weeks in advanceProject Manager1 Dec 2026LowOpen
SuperstructureTower crane recertification briefly delayed statutory inspectionReschedule inspection with certified body, add buffer to crane programSite Agent15 Sep 2026LowClosed

All tasks

Task date filter

Date range

32 tasks

  • 1Pre-construction
    Start 2 Mar 2026 → Finish 11 May 2026Slip +7dWt 2.1
    100%
  • 1.1Design approval
    Start 2 Mar 2026 → Finish 27 Mar 2026Slip 0Wt 1.1
    100%Resources: Architect
  • 1.2Permits and authority approvals
    Start 16 Mar 2026 → Finish 24 Apr 2026Slip +7dWt 0.4
    100%Resources: Architect, QS
  • 1.3Contractor mobilisation
    Start 27 Apr 2026 → Finish 8 May 2026Slip +7dWt 0.6
    100%Resources: Site engineer
  • 1.4Site possession
    Start 11 May 2026 → Finish 11 May 2026Slip +7dWt 0.0
    100%
  • 2Substructure
    Start 11 May 2026 → Finish 14 Aug 2026Slip +7dWt 20.3
    100%
  • 2.1Excavation and earthworks
    Start 11 May 2026 → Finish 5 Jun 2026Slip +7dWt 3.6
    100%Resources: Structural sub
  • 2.2Bored piling
    Start 8 Jun 2026 → Finish 17 Jul 2026Slip +7dWt 11.5
    100%Resources: Structural sub, Site engineer
  • 2.3Pile caps and ground beams
    Start 20 Jul 2026 → Finish 14 Aug 2026Slip +7dWt 5.2
    100%Resources: Structural sub
  • 2.4Substructure complete
    Start 14 Aug 2026 → Finish 14 Aug 2026Slip +7dWt 0.0
    100%
  • 3Superstructure
    Start 17 Aug 2026 → Finish 27 Nov 2026Slip +7dWt 25.3
    36%
  • 3.1Tower crane recertification
    Start 7 Sep 2026 → Finish 18 Sep 2026Slip 0Wt 0.2
    60%Resources: Site engineer
  • 3.2Level 1 to 3 columns and slabs
    Start 17 Aug 2026 → Finish 25 Sep 2026Slip +7dWt 10.5
    85%Resources: Structural sub
  • 3.3Level 4 to 6 columns and slabs
    Start 28 Sep 2026 → Finish 6 Nov 2026Slip +7dWt 10.5
    0%Resources: Structural sub
  • 3.4Roof slab
    Start 9 Nov 2026 → Finish 27 Nov 2026Slip +7dWt 4.0
    0%Resources: Structural sub
  • 3.5Structure topped out
    Start 27 Nov 2026 → Finish 27 Nov 2026Slip +7dWt 0.0
    0%
  • 4MEP services
    Start 7 Sep 2026 → Finish 18 Dec 2026Slip +7dWt 21.4
    13%
  • 4.1Electrical first fix
    Start 7 Sep 2026 → Finish 30 Oct 2026Slip +7dWt 6.2
    30%Resources: MEP sub
  • 4.2Plumbing and drainage
    Start 14 Sep 2026 → Finish 6 Nov 2026Slip +7dWt 4.6
    20%Resources: MEP sub
  • 4.3MEP first fix complete
    Start 6 Nov 2026 → Finish 6 Nov 2026Slip +7dWt 0.0
    0%
  • 4.4HVAC ductwork
    Start 19 Oct 2026 → Finish 11 Dec 2026Slip +7dWt 6.9
    0%Resources: MEP sub
  • 4.5Fire protection
    Start 2 Nov 2026 → Finish 18 Dec 2026Slip +7dWt 3.7
    0%Resources: MEP sub, Site engineer
  • 5Envelope and finishes
    Start 21 Sep 2026 → Finish 29 Jan 2027Slip +7dWt 28.3
    2%
  • 5.1Brickwork and blockwork
    Start 21 Sep 2026 → Finish 13 Nov 2026Slip +7dWt 5.3
    10%Resources: Finishing crew
  • 5.2Curtain wall and glazing
    Start 30 Nov 2026 → Finish 8 Jan 2027Slip +8dWt 13.4
    0%Resources: Facade sub
  • 5.3Building watertight
    Start 8 Jan 2027 → Finish 8 Jan 2027Slip +8dWt 0.0
    0%
  • 5.4Plastering and screeding
    Start 16 Nov 2026 → Finish 24 Dec 2026Slip +6dWt 3.6
    0%Resources: Finishing crew
  • 5.5Ceiling, tiling and painting
    Start 28 Dec 2026 → Finish 29 Jan 2027Slip +7dWt 5.9
    0%Resources: Finishing crew
  • 6Testing and handover
    Start 18 Jan 2027 → Finish 12 Feb 2027Slip +7dWt 2.6
    0%
  • 6.1Testing and commissioning
    Start 18 Jan 2027 → Finish 5 Feb 2027Slip +7dWt 1.7
    0%Resources: MEP sub, Site engineer
  • 6.2Snagging and defects
    Start 1 Feb 2027 → Finish 12 Feb 2027Slip +7dWt 0.9
    0%Resources: Site engineer, Finishing crew
  • 6.3Practical completion
    Start 12 Feb 2027 → Finish 12 Feb 2027Slip +7dWt 0.0
    0%
WBSTaskStartFinishSlipWeightProgressResources
1Pre-construction2 Mar 202611 May 2026+7d2.1100%
1.1Design approval2 Mar 202627 Mar 202601.1100%Architect
1.2Permits and authority approvals16 Mar 202624 Apr 2026+7d0.4100%Architect, QS
1.3Contractor mobilisation27 Apr 20268 May 2026+7d0.6100%Site engineer
1.4Site possession11 May 202611 May 2026+7d0.0100%
2Substructure11 May 202614 Aug 2026+7d20.3100%
2.1Excavation and earthworks11 May 20265 Jun 2026+7d3.6100%Structural sub
2.2Bored piling8 Jun 202617 Jul 2026+7d11.5100%Structural sub, Site engineer
2.3Pile caps and ground beams20 Jul 202614 Aug 2026+7d5.2100%Structural sub
2.4Substructure complete14 Aug 202614 Aug 2026+7d0.0100%
3Superstructure17 Aug 202627 Nov 2026+7d25.336%
3.1Tower crane recertification7 Sep 202618 Sep 202600.260%Site engineer
3.2Level 1 to 3 columns and slabs17 Aug 202625 Sep 2026+7d10.585%Structural sub
3.3Level 4 to 6 columns and slabs28 Sep 20266 Nov 2026+7d10.50%Structural sub
3.4Roof slab9 Nov 202627 Nov 2026+7d4.00%Structural sub
3.5Structure topped out27 Nov 202627 Nov 2026+7d0.00%
4MEP services7 Sep 202618 Dec 2026+7d21.413%
4.1Electrical first fix7 Sep 202630 Oct 2026+7d6.230%MEP sub
4.2Plumbing and drainage14 Sep 20266 Nov 2026+7d4.620%MEP sub
4.3MEP first fix complete6 Nov 20266 Nov 2026+7d0.00%
4.4HVAC ductwork19 Oct 202611 Dec 2026+7d6.90%MEP sub
4.5Fire protection2 Nov 202618 Dec 2026+7d3.70%MEP sub, Site engineer
5Envelope and finishes21 Sep 202629 Jan 2027+7d28.32%
5.1Brickwork and blockwork21 Sep 202613 Nov 2026+7d5.310%Finishing crew
5.2Curtain wall and glazing30 Nov 20268 Jan 2027+8d13.40%Facade sub
5.3Building watertight8 Jan 20278 Jan 2027+8d0.00%
5.4Plastering and screeding16 Nov 202624 Dec 2026+6d3.60%Finishing crew
5.5Ceiling, tiling and painting28 Dec 202629 Jan 2027+7d5.90%Finishing crew
6Testing and handover18 Jan 202712 Feb 2027+7d2.60%
6.1Testing and commissioning18 Jan 20275 Feb 2027+7d1.70%MEP sub, Site engineer
6.2Snagging and defects1 Feb 202712 Feb 2027+7d0.90%Site engineer, Finishing crew
6.3Practical completion12 Feb 202712 Feb 2027+7d0.00%
Which columns the upload reads

Export the Task table from MS Project (File, Save As, Excel Workbook) or the Activities table from Primavera P6. The first sheet is read. Required: Task Name, Start, Finish. Used when present: Baseline Start, Baseline Finish, % Complete, Outline Level or WBS, Resource Names, Critical, Milestone, Work, Baseline Cost (or Cost), Actual Cost, Weightage. P6 names such as Activity Name, BL Project Start and Activity % Complete are recognised too.

Columns read from this file: Task Name, WBS, Outline Level, Start, Finish, Baseline Start, Baseline Finish, % Complete, Resource Names, Critical, Milestone, Work, Actual Work, Baseline Cost, Actual Cost, Duration, Percent_Weightage, Percent_Actual_Financial, BCWS, BCWP.

Generated 25 Sep 2026 from sample-schedule.xlsx.